The roads leading to our BIGs may be subject to incidents, closures, etc. of varying duration. If you encounter a problem of this kind, you can report it in the ‘notes’ section for each climb. In this case, a warning, with the associated comment, will be posted on the BIG page. A warning symbol (triangle) will also appear in the lists by area.
If, on the other hand, you notice that the problem described is no longer relevant, please let us know, again via the ‘notes’ section of the page.
Below is a summary table of the problems currently reported. Feel free to click on the links and leave a note if necessary.
Les routes qui mènent à nos BIG peuvent être soumises à des incidents, des interdictions, ... de plus ou moins longue durée. Si vous constatez un problème de ce genre, vous pouvez le signaler dans la section "notes" de chaque ascension. Dans ce cas, un avertissement, avec le commentaire associé, sera mis en place sur la page du BIG. Un pictogramme de mise en garde (triangle) apparaîtra aussi dans les listes par zone.
Si a contrario vous constatez que le problème décrit n'est plus d'actualité, prévenez-nous, toujours par la section "notes" de la page.
Ci-dessous un tableau récapitulatif des problèmes signalés à l'heure actuelle. N'hésitez pas cliquer sur les liens et à laisser une note si nécessaire.
| Name | Country | Severity | Comment | Check date |
|---|---|---|---|---|
| Umskardet | NO | 1 | Earth barriers across the road. Apparently no problem for bicycles. Barrages de terre en travers de la route. Apparemment pas de problème pour les vélos |
28/07/2025 |
| Hardangervidda | NO | 2 | The road is officially closed, but some people seem to be using it anyway. At their own risk La route est officiellement fermé mais certaines semblent l''emprunter malgré tout. Aux risques et périls des usagers https://www.cycletourer.co.uk/tunnelinfo/mabo.shtml https://www.sykkel.org/topic/3190-m%C3%A5b%C3%B8dalen/ |
28/07/2025 |
| Feldberg | DE | 1 | Südhang bis Oktober 2025 in Bau South side under construction until October 2025 Versant sud en travaux jusqu''en octobre 2025 |
28/07/2025 |
| Col du Granier | FR | 1 | Tunnel du Pas de la Fosse fermé du 04/08/2025 au 10/10/2025. Versant N inaccessible Pas de la Fosse Tunnel closed from August 4, 2025 to October 10, 2025. North side inaccessible. |
28/07/2025 |
| Col du Petit Saint-Bernard | FR | 1 | Versant SW (France) fermé à partir du 22 septembre 2025 jusqu''à la fin des travaux (prévue le 14 novembre) SW side (France) closed since 22th of september 2025 until the end of the works (announced for the 14th of november) |
24/09/2025 |
| Tunnel du Parpaillon | FR | 2 | Eboulement à l''intérieur du tunnel. Réouverture hypothétique Landslide inside the tunnel. Hypothetical reopening Frana all''interno del tunnel. Riapertura ipotetica |
28/07/2025 |
| Bergeries de Grotelle | FR | 3 | Route inaccessible 4 km avant l''ancien sommet. Réouverture incertaine Strada impraticabile 4 km prima della vecchia vetta. Riapertura incerta. Road impassable 4 km before the former summit. Reopening uncertain. |
28/07/2025 |
| Port d'Envalira | AD | 1 | Versant N : la N20 est fermée après l''Hospitalet jusqu''à l''automnei 2025 (construction d''un paravalanche). Une déviation est mise en place via la N22. Sinon, il y a 300m de vrai muletier N side : the N20 is closed after l''Hospitalet until autumn 2025 (construction of an avalanche barrier). A diversion is in place via the N22. Otherwise, 300 m with Gravel section. |
28/07/2025 |
| Puerto de Noguera de Albarracín (incl. Puerto de Orihuela del Tremedal) | ES | 1 | Obras en curso, riesgos de demora, finalización en septiembre. Construction work in progress, delays possible, completion in September Chantier en cours, risques d''attente, fin en septembre |
28/07/2025 |
| Bica da Cana (incl. Boca Encumeada) (Madeira) | PT | 2 | ER105 fechada devido a deslizamentos de terra. Lados SE e NE intransitáveis. ER105 closed due to landslides. SE and NE sides non transitable. |
28/07/2025 |
| Bielerhöhe | AT | 1 | NW-Zugang geschlossen, Wiedereröffnung auf Frühjahr 2026 verschoben. Alternative Route für den NW-Zugang: Nach Partenen über den Natacha Kops Stausee und nach dem Abstieg den NE-Hang hinaufsteigen. NW access closed, reopening postponed until spring 2026. Alternative route for NW access: after Partenen, go via Natacha Kops Stausee and climb the NE side after the descent. Accès NW fermé, réouverture reportée au printemps 2026. Solution alternative pour l''accès NW : après Partenen passer par le Natacha Kops Stausee et remonter le versant NE après la descente https://www.oeamtc.at/news/vorarlberg/silvretta-hochalpenstrasse-sperre-bis-2026-24352721 |
16/08/2025 |
| Colle di Tenda | IT | 1 | Le versant sud est fermé depuis le 28 juin 2025. Pas de date de réouverture annoncée pour l''instant. Il versante sud è chiuso dal 28 giugno 2025. Nessuna data di riapertura annunciata per il momento. The south side has been closed since 28 June 2025. No reopening date has been announced yet. |
02/08/2025 |
| Monte Grappa | IT | 1 | Settembre 2022: il versante sud-est è chiuso a causa di lavori stradali. Da allora non sono state trovate nuove informazioni. September 2022: The SE side is closed due to roadworks. No new information has been found since then. |
28/07/2025 |
| Vrbatova Bouda | CZ | 1 | Road works section after the village of Vitkovice avoidable with a small detour | 04/08/2025 |
| Tokaji-hegy | HU | 2 | Access to the top forbidden for military operations. No date for reopening available https://infostart.hu/belfold/2025/07/28/katonak-orzik-tokajban-a-kopasz-hegyet-most-nem-erdemes-kirandulast-tervezni-oda |
19/08/2025 |
| Bükk-tetö | HU | 1 | SW side closed until August 2025 | 28/07/2025 |
| Salze | AD | 1 | 10 short steps in a staircase inside shorter side (just for fun) 10 petites marches d'escalier dans le versant le plus court (juste pour le fun) |
28/07/2025 |
| Rollesbroich / Silberscheidt | DE | 1 | Sollte bis Juni 2025 geschlossen bleiben. Seitdem wurden keine Informationen zur Wiedereröffnung gefunden. Was supposed to be closed until june 2025. No reopening informations found since |
28/07/2025 |
| Bleckenau | DE | 1 | Nur nach 19 Uhr zugänglich (tagsüber ist die Straße für einen Busservice reserviert) Only available for cyclists after 7PM (during the day, the road is booked for a bus service Seulement accessible après 7h du soir (pendant la journée, la route est réservée à un service de bus) |
28/07/2025 |
| Raarberg | NL | 1 | Noordwestelijke zijde ontoegankelijk vanwege wegwerkzaamheden NW side inaccessible for road works |
16/08/2025 |
| Colle della Maddalena (Col de Larche) | IT | 1 | Travaux avec coupure de la route de août à octobre 2025 Lavori con chiusura della strada da agosto a ottobre 2025 Roadworks with road closures from August to October 2025 |
28/07/2025 |
| Monte Creo | IT | 2 | Il lato SE non è transitabile a causa di una grave frana. Il lato SE2 è stato creato come alternativa. I lavori sono iniziati, ma potrebbero richiedere molti anni. SE side non transitable due to major landslide. SE2 side created as an alternative. Works started but may take many years |
28/07/2025 |
| Alto de Aitana | ES | 1 | Es necesario realizar un trámite ante la autoridad militar antes de subir. Se agradece cualquier información (reciente) sobre este trámite. A request must be made to the military authorities before climbing. More (recent) information on this procedure is welcome. Une démarche est à faire auprès de l''autori.té militaire avant de monter. Plus d''informations (récentes) sur cette démarche bienvenues |
28/07/2025 |
| Candes | FR | 1 | Juin 2024 : route fermée pour cause d''éboulement. Pas d''infos depuis, devrait être rouverte June 2024: road closed due to landslide. No information since then, should be reopened. |
28/07/2025 |
| Col de la Joux (Col de Saint-Maurice-Crillat) | FR | 1 | Versant NW bloqué entre le pied NW et Crillat. Travaux prévus à l''été 2025 pour une réouverture en fin d''année. Versant NW2 ajouté pour éviter la portion barrée. NW side blocked between the NW foot and Crillat. Work planned for summer 2025 with reopening at the end of the year. NW2 side added to avoid the blocked section. |
28/07/2025 |
| La Bérarde | FR | 3 | Village dévasté, aucun accès dans l''immédiat Villaggio devastato, nessun accesso immediato Village devastated, no access for the years to come |
28/07/2025 |
| Madone de Fenestre | FR | 1 | Eté 2025 : quelques tronçons non goudronnés depuis la tempête Alex Summer 2025 : Some parts of the road no more asphalted since Alex storm Estate 2025 : alcuni tratti non asfaltati dopo la tempesta Alex |
28/07/2025 |